[08:26, 30/04/2024] Azman HKL: Site progress photo.
30/4/24.
20th floor. TA. Slab support shoring, lift wall rebar, and column rebar in progress.

[08:26, 30/04/2024] Azman HKL: 6th floor. TB5. Slab formwork and beam rebar in progress.

[08:26, 30/04/2024] Azman HKL: 6th floor. TB4. Slab rebar in progress. TB5. Slab formwork and beam rebar in progress.

[08:26, 30/04/2024] Azman HKL: 6th floor. Slab formwork in progress.
[08:50, 30/04/2024] Azman HKL: Morning. Kindly please update and send to me by today M&E NSC progress for this Thursday Meeting. TQ. πŸ™πŸ™@~ShawnChia @HIDAYA KH office Num @Recky Econmech @~sklaw3
[09:03, 30/04/2024] Jimmy HKL: PERINGATAN

Peringatan untuk menghadiri taklimat keselamatan daripada SESB hari ini pada jam 10 pagi di bilik mesyuarat tapak bina PHKL. Mohon hantar seorang wakil untuk hadir. Sekian terima kasih.

[09:19, 30/04/2024] Azman HKL: @~WY @~Rimon Joseph ini macam mana? Confirm tidak sambung sekarang?

[09:42, 30/04/2024] Azman HKL: Man Hole external works in progress.
[09:43, 30/04/2024] +60 14-379 2990: Proceed ja man..

[10:01, 30/04/2024] Azman HKL: Taklimat SESB : PEMASANGAN KESELAMATAN DAN KESEDARAN ELEKTRIK DI KAWASAN LADANG DAN TEMPAT AWAM
 

Sunday, April 28, 2024

28 APRIL 2024 HKL

 NSC GROUP 


[08:54, 28/04/2024] Azman HKL: Site progress photo
28/4/24
20th floor. TA. Column works and slab shoring in progress


[08:54, 28/04/2024] Azman HKL: 6th floor. TB4. Slab formwork in progress. 7th floor. TB5. Slab formwork and beam rebar in lrogress


[08:54, 28/04/2024] Azman HKL: 6th floor. Lift wall formwork. Slab shoring in progress

[08:54, 28/04/2024] Azman HKL: 7th floor. Slab formwork and beam rebar.



[09:03, 28/04/2024] Azman HKL: @Azman HKL sodah buka level 3


[09:03, 28/04/2024] Azman HKL: 4th floor sodah buka
[09:03, 28/04/2024] Azman HKL: @HIDAYA KH office Num πŸ‘†
[09:04, 28/04/2024] Azman HKL: @~s4yamahuk4ya88.gmail.com
[14:00, 28/04/2024] HIDAYA KH office Num: okay tqtq πŸ™πŸΌ


Friday, April 26, 2024

27 APRIL 2024 HKL

SITE EG MALL

[10:59, 27/04/2024] Azman HKL: 20th floor. TA2. 9.40pm. M&E inspection done.


NSC GROUP  

[08:30, 27/04/2024] Azman HKL: Site progress photo.
27/4/24
20th floor. Slab cast.

[08:30, 27/04/2024] Azman HKL: 20th floor. TA1. Column and Shoring support in progress

[08:30, 27/04/2024] Azman HKL: 7th floor. TB5. Slab formwork and rebar in progress

[08:30, 27/04/2024] Azman HKL: 6th floor. Slab shoring support and lift wall in progress.

[08:30, 27/04/2024] Azman HKL: 6th floor. TB4. Slab formwork in progress.

[08:37, 27/04/2024] Azman HKL: Basement @EG MALL ECONMECH Dart @EG MALL Mr Lo CO2 plinth affected the scupper drain. πŸ‘†can we coordinate. πŸ™
[08:41, 27/04/2024] EG MALL ECONMECH Dart: Bole man πŸ™πŸΌ

[08:47, 27/04/2024] Azman HKL: External MH4 in progress.

[09:06, 27/04/2024] +60 19-809 6068: Morning @Azman HKL . Boleh minta tolong buka formwork. Kami mau psg pipe sprinkler. 3rd floor. Str 9. Tq.
[09:14, 27/04/2024] Azman HKL: Ini yang semalam bah kan. Saya kejar subcon buka ji hari













[10:05, 27/04/2024] +60 16-837 8881: @Azman HKL minta tolong clear lagi ni riser hotel .....
Lama sudah
[10:06, 27/04/2024] +60 16-837 8881: Kerja saya sangkut sudah , riser ni perlu
[10:07, 27/04/2024] +60 16-837 8881: Mahu 1 bulan sudah minta tolong

[10:10, 27/04/2024] Azman HKL: Electrical room. @~N@m3£3zz@}+——-{ @~Roxas Ng (Kai) . Betul ini lama sudah. Subcon lama macam tiada minat maw bikin. Boleh proposed untuk subcon baru buat. πŸ™πŸ™. Electrical, ELV kerja tergantung di sini.
[10:20, 27/04/2024] +60 19-802 0222: Sy minta proposed sub lain la yg buat…
[10:20, 27/04/2024] +60 19-802 0222: Sy inform ofis dulu…
[10:28, 27/04/2024] Azman HKL: πŸ™

[10:28, 27/04/2024] Azman HKL: External MH6 excavation in progress.

[10:49, 27/04/2024] +60 14-379 2990: Nanti kami extend pipe.. type side throw.. mau tggu ceiling level.
[10:49, 27/04/2024] Azman HKL: @~Rimon Joseph 10th floor. Tolong atur minta kasi panjang itu paip. Jumpa subcon bata di sana
[10:49, 27/04/2024] +60 14-379 2990: Kami extend elbow.
[10:56, 27/04/2024] Azman HKL: @~Roxas Ng (Kai) πŸ‘†

[11:21, 27/04/2024] Azman HKL: External work. GL: L. @~ShawnChia tolong confirm kamu punya Man Hole JC9C dan pipe PN10 disini. Sekarang sedang jalan Sewer Man Hole. Bagus jalan satu kali. πŸ™πŸ™
[11:22, 27/04/2024] +60 16-837 8881: πŸ‘πŸ»
[13:16, 27/04/2024] Azman HKL: 6th floor. TB4. Slab formwork in progress. 7th floor. TB5. Beam rebar in progress

[13:17, 27/04/2024] Azman HKL: 20th floor. Column rebar and slab shoring support in progress.

[13:41, 27/04/2024] HIDAYA KH office Num: @Azman HKL  minta tolong buka formwork riser dekat ST-05 πŸ™πŸΌπŸ™πŸΌ
[13:55, 27/04/2024] Azman HKL: Tingkat brapa ni?
[13:59, 27/04/2024] HIDAYA KH office Num: ehh sorry lupa. 4th floor tu
[13:59, 27/04/2024] Azman HKL: Ok. πŸ‘Œ


[15:35, 27/04/2024] Azman HKL: Sesb incoming and JC9C discussion on site with DCC on site.
[15:46, 27/04/2024] Jimmy HKL: MAKLUMAN

Untuk makluman semua pada 30.04.2024 bersamaan hari Selasa jam 10 pagi pihak SESB akan membuat taklimat berkaitan Keselamatan Berhampiran Talian Penghantaran SESB yang akan diadakan di Bilik Mesyuarat Tapak Bina PHKL.  Setiap subkontraktor wajib untuk menghantar seorang wakil untuk menghadiri taklimat tersebut. Mohon beri kerjasama. Sekian Terima Kasih.

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...