27 MAC 2024 HKL

SITE EG MALL GROUP


[09:54, 27/03/2024] Azman HKL: Plumbing services high level joint inspection at Basement Floor.


[10:05, 27/03/2024] Azman HKL: Upvc pipe

[10:08, 27/03/2024] Azman HKL: Upvc pipe

[10:11, 27/03/2024] Azman HKL: Cold water pipe

 NSC GROUP 

[08:13, 27/03/2024] Azman HKL: Site photo progress.
27/3/24.
19th floor. TA1. Slab formwork in progress. TA2. Column and lift wall rebar and  in progress.

[08:13, 27/03/2024] Azman HKL: 4th floor. TB6. Slab support in progress

[08:58, 27/03/2024] Azman HKL: Man Hole

[08:58, 27/03/2024] Azman HKL: Man Hole

[08:58, 27/03/2024] Azman HKL: Man hole RC wall in progress. @HIDAYA KH office Num please check pipe outlet and liaise with Kinnangland supervisor and Laisam on site. 🙏

[09:35, 27/03/2024] Azman HKL: MH16 inspection with consultant.

[09:41, 27/03/2024] Azman HKL: MH15

[09:41, 27/03/2024] Azman HKL: MH14

[13:30, 27/03/2024] Azman HKL: 19th floor. TA1. Slab formwork and beam rebar in progress.
[13:30, 27/03/2024] +60 12-559 6863: Azman, ini slab target casting esok ya
[13:31, 27/03/2024] +60 12-559 6863: TA/2 30/03
[13:31, 27/03/2024] Azman HKL: Okay. Noted.
[13:44, 27/03/2024] Azman HKL: Basement. Fire tank. Brick work ini maw tutup ya. @~WY 👆.
[13:45, 27/03/2024] Azman HKL: @EG MALL ECONMECH Dart @~WY besok kamu punya kontena 40' ada datang kan? Tolong atur sama @Jimmy HKL sama share itu detail barang yang maw sampai. 🙏
[13:47, 27/03/2024] EG MALL ECONMECH Dart: YA man
[13:53, 27/03/2024] Azman HKL: 1st floor. Hotel lift shaft clearing still in progress. @~YoonYK 👆

[14:04, 27/03/2024] Azman HKL: 3rd floor. Lift lobby clearing in progress.


[14:17, 27/03/2024] Azman HKL: 3rd floor, water tank plinth. @HIDAYA KH office Num tolong kita cek dia ini satu tangki plinth. 🙏👆.