Thursday, March 21, 2024

21 MAC 2024 HKL

SITE EG MALL


[11:02, 21/03/2024] +60 16-880 4632: Foor no protection..
newly done screeding work.
[11:03, 21/03/2024] +60 16-880 4632: Floor

[11:06, 21/03/2024] +60 16-880 4632: Rusty metal door frame at basement..


 NSC GROUP 

[10:08, 21/03/2024] Azman HKL: Basement, fire tank. @HIDAYA KH office Num tolong check. Ini kalau bata tutup, kamu punya sump pump boleh masuk sini ka.

[10:08, 21/03/2024] Azman HKL: Basement. Fire tank.Sini satu lagi hujung. Tolong check. jangan nanti kita kena buka lagi itu tangki. Bising si Dart.

[10:26, 21/03/2024] Azman HKL: Ini comfirm dulu. @HIDAYA KH office Num  Masih pakai atau tidak. Kalau tdk bagus awal2 potong sebelum kita kena bising.

[10:51, 21/03/2024] Azman HKL: Water tank plinth level checking failed. @~Roxas Ng (Kai) @~π‘…π’Άπ“Ž π’žπ’½π‘œπ“ƒπ‘” 3 times our subcon failed to deliver as they promised. We want to handover the room by this week. Please advise. πŸ™πŸ™

[11:10, 21/03/2024] Azman HKL: Site progress photo.
21/3/2024.18th floor. TA1. Slab cast.


[11:10, 21/03/2024] Azman HKL: 18th floor. TA2. Slab support in progress.

[11:10, 21/03/2024] Azman HKL: 4th floor. TB6. Slab formwork in progress.

[11:10, 21/03/2024] Azman HKL: 7th floor. TB4. Slab formwork in progress.



[13:43, 21/03/2024] Azman HKL: oday's site meeting with client. NSC please joint the meeting at site meeting room. EGMall Bundusan at 3pm. @EG MALL ECONMECH Dart @~LO KEAM @Edwin Chen 013 @~YoonYK @~sklaw3 @~alexkp1968@gmail.com @+60 17-866 9697 

[13:44, 21/03/2024] Azman HKL: Today's site meeting with client. NSC please joint the meeting at site meeting room. EGMall Bundusan at 3pm. @EG MALL ECONMECH Dart @~LO KEAM @Edwin Chen 013 @~YoonYK @~sklaw3 @~alexkp1968@gmail.com @+60 17-866 9697

[19:37, 21/03/2024] +60 12-559 6863: Dear all NSCs, recap on what was instructed by Mr. Lan Promes in the site meeting this afternoon, kindly put on hold all works at basement to 2nd floor, submit your work done acknowledge by Mr. Kadapi ASAP. And also please write to us this delay event instructed by client and consultant before coming Saturday, we need to write to SO the NOD letter next Monday, thank u for your cooperation πŸ™ failure which, u may not claim EOT for the event


No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...