Friday, March 1, 2024

02 MAC 2024 HKL

SITE EG MALL


[10:18, 02/03/2024] Azman HKL: Safety committee meeting. No3.



 NSC GROUP

[09:28, 02/03/2024] Azman HKL: @Azman HKL can ask for your team to remove all the plaster? My team will get it repaired to fit properly as this one is totally off from the wall alignment
[09:29, 02/03/2024] Azman HKL: @~Leppong tolong atur dia. Di Tower A.
[09:30, 02/03/2024] Azman HKL: 8th floor

[09:37, 02/03/2024] Azman HKL: Site progress photo. 
2/3/24.
4th floor. TB4. Slab formwork in progress.

[09:37, 02/03/2024] Azman HKL: 7th floor. P7a. Slab cast.

[09:37, 02/03/2024] Azman HKL: 2nd floor. TB6. Lift wall rebar and formwork in progress. ST2 retaining wall rebar in progress

[09:58, 02/03/2024] Azman HKL: @~.Fazli tolong hantar org cek ini socket di column 16th floor. Bincang sama tukang pasang column di atas. TQ. 🙏
[10:08, 02/03/2024] Azman HKL: Safety meeting is ongoing. DCC site PIC please attend..
[10:14, 02/03/2024] +60 12-843 3877: 👌🏻

No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...