SITE EG MALL
[14:09, 28/02/2024] Azman HKL: 7th floor. ZP7a. Request for inspection at 2.30pm. @Kadapi J. PROMES . π. All NSC PIC please standby on site during inspection. TQ. ππ
[15:12, 28/02/2024] Kadapi J. PROMES: Kau punya bos minta pasang canvas tutup iti silencer....π
π
π
[15:13, 28/02/2024] Kadapi J. PROMES: @Azman HKL Tolong tutup silencer guna canvess ahh. Boss complaint sdh owhh
[15:14, 28/02/2024] +60 12-559 6863: ini bukan DCC cover meh?
[15:16, 28/02/2024] +60 12-843 3877: Nanti kami tutuplahππ»
[15:23, 28/02/2024] Azman HKL: 7th floor. Z P7a. M&E inspection in progress.
[16:02, 28/02/2024] Azman HKL: Done M&E inspection done.
NSC GROUP
[08:41, 28/02/2024] Azman HKL: Site progress photo.
28/2/24.
7th floor. Zone P7A. Slab rebar and M&E in progress.
[08:41, 28/02/2024] Azman HKL: 2nd floor. TB6. Slab cast.
[08:41, 28/02/2024] Azman HKL: 16th floor. TA1. Slab rebar in progress. TA2. Lift wall rebar in progress
[11:46, 28/02/2024] Azman HKL: 16th floor. TA1. Slab rebar in progress.
[11:46, 28/02/2024] Azman HKL: 7th floor. ZP7a. Slab rebar and M&E in progress.
[11:46, 28/02/2024] Azman HKL: 4th floor. TB4. Slab formwork in progress