SITE EG MALL
[10:40, 15/02/2024] Kadapi J. PROMES: @Azman HKL , @EG MALL ECONMECH Dart , @Edwin Chen 013 , @HIDAYA KH office Num , @~WY. LEVEL 3 NEAR ST 5. THE STACK PIPE OBSTRUCTED BY THE DUCTING. PLEASE COORDINATE. TQ
[10:55, 15/02/2024] Azman HKL: Ok. Noted.
NSC GROUP
[09:17, 15/02/2024] Azman HKL: Site progress photo.
15/2/24.
15th floor. TA1. Slab rebar, construction beam and M&E in progress. 14th floor. TA2. Slab formwork, lift wall and column in progress.
[09:17, 15/02/2024] Azman HKL: 2nd floor. TB6. Slab formwork in progress.
[09:18, 15/02/2024] Azman HKL: 1st floor. Z8. Slab formwork in progress.
[09:58, 15/02/2024] Azman HKL: Basement. @HIDAYA KH office Num sebelum finalised tolong cek semua tu plumbing water pipe line. Make sure in a straight line. Some pipes are not straight. Consultant comment. 🙏🙏
[09:58, 15/02/2024] Azman HKL: Please check the pipe line straightness before finalizing. 🙏🙏
[10:01, 15/02/2024] HIDAYA KH office Num: okay azman
No comments:
Post a Comment