1. This coming Monday, 8/1/24, there will be a last site inspection and setting out 120 ton mobile crane by the lifting team to make sure the site's mobile crane access area and temporary storage at the 6th floor are ready.
2. 9/1/2024, Tuesday, the lifting team will come early in progress the morning. Pull out equipment at the ground floor and lift it to the 6th floor for temporary storage.
@~Leppong @~ShawnChia @Jimmy HKL @Kadapi J. PROMES @Mr. Voo @~π‘…π’Άπ“Ž π’žπ’½π‘œπ“ƒπ‘”
[13:56, 05/01/2024] Kadapi J. PROMES: We r On
[13:56, 05/01/2024] Kadapi J. PROMES: πŸ™‚
[14:11, 05/01/2024] Jimmy HKL: noted and DCC @~.Fazli please submit PTW before any lifting works.
[14:37, 05/01/2024] Azman HKL: 11th floor. TA1. Request for M&E inspection at 3pm. @Kadapi J. PROMES . NSC PIC please stand at the location during inspection. TQ.

[14:39, 05/01/2024] Azman HKL: 11th floor. TA1 
 

NSC GROUP


[08:34, 05/01/2024] Azman HKL: Good morning. 
Site progress photo.
5/1/24.
11th floor. TA1. Slab rebar and M&E in progress. Column rebar in progress.

[08:34, 05/01/2024] Azman HKL: 10th floor. TA2. Lift wall formwork and column rebar in progress.

[08:34, 05/01/2024] Azman HKL: 6th floor. Z6. Slab rebar and M&E in progress. 4th floor. Parapet wall and column formwork in progress.

[08:34, 05/01/2024] Azman HKL: Basement. Lift wall rebar in progress





[10:32, 05/01/2024] Mr. Voo: @Azman HKL  btl kah ni bracket permanent di pakai mcm ni punya ? Nampak mcm rumah kampung di sana sipitang saje ni πŸ˜…
[10:59, 05/01/2024] Azman HKL: πŸ€”. Biasa pakai yang proper bracket untuk PVC pipe yang ada lapik getah. Maw cek itu approves material submission. @King Hong Office @HIDAYA KH office Num tolong cek ya.

[10:59, 05/01/2024] Azman HKL: Selalu tgk jenis ni di pasang.
[11:00, 05/01/2024] Mr. Voo: Btl
[11:05, 05/01/2024] Edwin Chen 013: This is for ceiling pipe hanging
[11:15, 05/01/2024] Edwin Chen 013: @Mr. Voo, kindly send the image of sipitang for comparison, as mentioned in your recent statement for us to review.
[11:29, 05/01/2024] Azman HKL: It's okay  we all want the best. I will check the technical and get consultant comments and approval. No further comment regarding this, I will get a consultant inspection. πŸ™
[11:56, 05/01/2024] Mr. Voo: It’s pvc pipe also suite for this type of bracket ?
[11:58, 05/01/2024] Edwin Chen 013: Yes. C Channel and U bolt.
[11:58, 05/01/2024] Mr. Voo: It’s RWDP ?
[12:00, 05/01/2024] Edwin Chen 013: No. Waste and soil pipe.
[12:02, 05/01/2024] Mr. Voo: Ok
[12:02, 05/01/2024] Edwin Chen 013: Waste and soil pipes are responsible for carrying wastewater and sewage away from buildings. Brackets are used to secure these pipes in a way that ensures they maintain a proper slope for effective drainage
[13:55, 05/01/2024] Azman HKL: For info
As informed by DCC, from the Genset and transformer suppliers and logistics Mr. Howard:
1. This coming Monday, 8/1/24, there will be a last site inspection and setting up 120ton mobile crane by the lifting team to make sure the site's mobile crane access area and temporary storage at the 6th floor are ready.
2. 9/1/2024, Tuesday, the lifting team will come early in progress the morning. Pull out equipment at the ground floor and lift it to the 6th floor for temporary storage.
@~Leppong @~ShawnChia @Jimmy HKL @⁨Kadapi J. EG Mall Promess Gadapi⁩ @Mr. Voo @~π‘…π’Άπ“Ž π’žπ’½π‘œπ“ƒπ‘”
[14:36, 05/01/2024] Azman HKL: 2 units more to complete electrical conduit.

[15:25, 05/01/2024] Azman HKL: 11th floor. TA1. M&E pre-inspection in progress..