[13:26, 22/12/2023] Azman HKL: 3rd floor, Z7. Request for inspection M&E services cast in slab at 2.30pm.
[13:26, 22/12/2023] Azman HKL: 6th floor. TB3. Request for inspection, M&E services cast in slab at 3.00pm @Kadapi J. PROMES . All NSC incharge please stanby during inspection
[13:35, 22/12/2023] Kadapi J. PROMES: Hujan
[14:05, 22/12/2023] Azman HKL: Tunggu hujan berenti bos.😩
NSC GROUP
[09:24, 22/12/2023] Azman HKL: Good morning.
Site progress photo.
10th floor. TA1. Slab scaffolding in progress. 9th floor. TA2. Slab cast.
[09:24, 22/12/2023] Azman HKL: 3rd floor. Z7. Slab formwork in progress. Ramp 4. Slab rebar and M&E in progress.
[09:24, 22/12/2023] Azman HKL: 7th floor. Z4. Slab rebar in progress.
[09:41, 22/12/2023] Azman HKL: 6th floor. TB3. Slab rebar and M&E in progress.
[10:11, 22/12/2023] HIDAYA KH office Num: 6F TB3
[10:11, 22/12/2023] HIDAYA KH office Num: 7F Zone 4
[10:11, 22/12/2023] HIDAYA KH office Num: @Lo. W. H (HKL-Site Engineer) morning mr lo. scupper drain ☝🏼
[10:12, 22/12/2023] Lo. W. H (HKL-Site Engineer): confirm position dia satu kali bila dia orang habis tu formwork drop
[10:12, 22/12/2023] Lo. W. H (HKL-Site Engineer): thanks
[15:31, 22/12/2023] Azman HKL: M&E inspection in progress..
[15:37, 22/12/2023] Azman HKL: Fire & Acmv inspection
[16:02, 22/12/2023] Azman HKL: 6th floor. TB3 & 3rd floor. Z7. Ramp5 inspection done. @~nas4rie please proceed.