[09:06, 05/12/2023] Azman HKL: Good morning.
Site progress photo.
5/12/2023.
8th floor. TA1a. Slab rebar and M&E services in progress. 

[09:07, 05/12/2023] Azman HKL: 8th floor. TA1.

[09:08, 05/12/2023] Azman HKL: Basement. Z9. Slab foundation and retaining wall in progress.
[09:28, 05/12/2023] +60 10-941 8970: @Azman HKL inspection of lift wall 5F zone 6 at 1pm just for info

[09:38, 05/12/2023] Azman HKL: 5th floor. Z6. Lift wall opening dimension inspection with consultant and Mitsubishi. Some comment. 1. Please double check and confirm the finish floor is 30.650FFL. Later maybe rise screeding and tiles 50mm so that door&button height have to rise also to FFL level 2. The current door opening 2200mm from SFL and 1000mm button box from SFL. 3. The other opening dimensions are ok. Please proceed after rectification.
[09:38, 05/12/2023] Azman HKL: @~nas4rie 👆
[09:39, 05/12/2023] Azman HKL: Sda post sana group RC.

[15:24, 05/12/2023] Azman HKL: Jom meeting site .
[16:20, 05/12/2023] +60 14-379 2990: @Azman HKL masih hujan lebat.. jadikah cast hari ini?
[16:22, 05/12/2023] +60 14-379 2990: Kami masih pasang 9 nos box opening for toilet exhaust fan.. every riser..
[16:23, 05/12/2023] Azman HKL: Iya. Tunggu sama saya punya bos @Mr. Voo nanti inform semua.
[16:25, 05/12/2023] Mr. Voo: Postpone besok
[16:26, 05/12/2023] Mr. Voo: @Azman HKL
[16:26, 05/12/2023] Azman HKL: Ok noted. 👆

[16:29, 05/12/2023] Azman HKL: @HIDAYA KH office Num bsok tolong atur kasi alih sikit supaya boleh skimm column