SITE GROUP
EG MALL Azman: Morning. This morning at 9.30am kan. ππ
+60 19-821 8251: Yap.
EG MALL Azman: 7th floor. TA2/a. Request for inspection M&E at 3.30pm. @Kadapi J. PROMES
NSC GROUP
Lo. W. H (HKL-Site Engineer): @HIDAYA KH office Num ni hari kita cast tu TA/2
Lo. W. H (HKL-Site Engineer): ada simpan flow trap untuk scupper drain kah
HIDAYA KH office Num: ada suda
HIDAYA KH office Num: kemarin
Lo. W. H (HKL-Site Engineer): ni hari punua gambar kalau you sudah naik atas
HIDAYA KH office Num: okay2 boleh
Lo. W. H (HKL-Site Engineer): thanks
EG MALL Azman: @~Walker Yapi ST4. Tolong atur dia sebelum dia orang plastering. π
Lo. W. H (HKL-Site Engineer): Thanks
EG MALL Kai: Siapa punya lorry?
EG MALL Kai: π
+60 16-526 1788: Eh boleh naik Sudah ka?
EG MALL Kai: Tidak boleh, sudah saya minta out from site
Raymond Chong. Y. F (HKL P. Manager): kalao loading unloading bolih masuk
EG MALL Azman: GnB punya lorry π. Hantar air.
EG MALL Azman: Hi.. Today M&E meeting we postponed. I have another meeting and a slab inspection this afternoon.
EG MALL Azman: Site progress photo.
28/11/2023.
7th floor. TA/2a. Slab rebar and M&E in progress.
EG MALL Azman: 4th floor. TB5. Slab rebar and M&E in progress.
EG MALL Azman: 8th floor. TA1. Slab formwork in progress
EG MALL Azman: 6th floor. TA2. Slab support and formwork in progress.
EG MALL Azman: 3rd floor. Z7. Slab formwork and column in progress
EG MALL Azman: 7th floor. TA2a. M&E inspection for slab services in progress.
EG MALL Azman: Archi drawing.
EG MALL Azman: Done inspection. @Mr. Voo @~nas4rie please proceed.
EG MALL Azman: @EG MALL Azman ada tak machines² kamu di bawah basement lagi? Yg Dekat² tiang² tlg sasar sikit supaya kasturi boleh jln
Mr. Voo: ππ»
EG MALL Azman: NSC PIC, tolong saya check jika ada barang kamu blocking wall atau column. Wall & column Skim work in progress. πππ