Tuesday, November 7, 2023

08 NOV 23 HKL

SITE GROUP
 Kadapi J. PROMES: King Hong, please check you sanitary pipe if requir beam opening. As u know that in between level 6 to 7 is limited high. Tq
 HIDAYA KH office Num: okay


Kadapi J. PROMES: ECM, @Dart Econmech , i think this area can push up a bit.
Kadapi J. PROMES: I mean the plate slab area, ur pipe have to rise up a bit. Based on our discussion last time🙂

NSC GROUP
EG MALL Azman: @~.Fazli @~Walker Yapi @HIDAYA KH office Num Ini project jangan guna Level. Kita semua guna Floor ya dala report dengan RFI. Kasi sama semua ya.
 Raymond Chong. Y. F (HKL P. Manager): Dear all NSC, as per request in our previous NSC meeting, kindly submit your progress report cut off 07/11/23 by today for the site meeting tomorrow. TQ




+60 12-843 3877: Installation trunking and wiring@level_5







EG MALL Azman: 6th floor. TA2. Slab rebar in progress

EG MALL Azman: 7th floor. slab rebar in progress
 +60 16-526 1788: Ni tolong kasi bubut simin dia. 🙏🏾
EG MALL Azman: Iya bos. Ini siap itu bottom besi terus masuk conduit.
 +60 16-526 1788: 🙏🏾








 

No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...