Sunday, November 5, 2023

06 NOV 23 HKL

SITE GROUP
 EG MALL Azman: 3rd floor. TB3. Request for M&E inspection. 2.30pm. @Kadapi J. PROMES . NSC please be ready and stanby for inspection. RFI form and drawing. TQ. πŸ™πŸ™

EG MALL Azman: 🌧️😭


NSC GROUP
 EG MALL Azman: Morning. Sorry to inform. @HIDAYA KH office Num tolong minta check balik. Masih ada masuk air.
HIDAYA KH office Num: okay2
EG MALL Azman: Safety Tool box briefing 8.30am. NSC tolong stanby.
EG MALL Azman: Morning safety toolbox...
 HIDAYA KH office Num: morning. out water tank installer arrived on site. will start installation works after done housekeeping done by HKL
+60 12-843 3877: Azman. Boleh tolong atur pindah ini barang.skapolding mau lalu untuk buat kerjaπŸ™πŸ»
 EG MALL Azman: Good morning. 
Site progress photo.
6/11/2023
3rd floor. TB3. Slab rebar and M&E in progress.
EG MALL Azman: 7th floor. TA1. Slab formwork and rebar in progress.
EG MALL Azman: 5th floor. Z6. Slab formwork in progress.
EG MALL Azman: 6th floor. TA2. Slab formwork in progress
EG MALL Azman: 6th floor. TA2. Slab formwork in progress.
EG MALL Azman: 6rh floor. TB1. Slab formwork in progress.
 EG MALL Azman: Apa floor n tempat? Saya inform subcon GnB atur pindah. Cari buat tempat lain dulu yeh, sebab ambil masa juga tu mereka atur pindah.
+60 12-843 3877: Level ,1 dekat lif
 EG MALL Azman: @~.Fazli sudah inform GnB. Lain tempat mana kamu maw pasang kasi inform satu kali. Jadi mereka kasi bersih satu kali.
+60 12-843 3877: Tiada gerak bro

 EG MALL Azman: @~.Fazli Tgk juga tu bro. Kalau kasi inform kelmarin, mungkin pagi tadi mereka boleh start buat itu sana floor. Kamu baru inform tadi. Tunggu mereka siap lain tempat baru pg sana.
Dart Econmech: @Lo. W. H (HKL-Site Engineer) just want to ask. Slab L6 also got opening for escalator?
Dart Econmech: Floor plan L6 no opening for escalator.
 Lo. W. H (HKL-Site Engineer): Ya
 Dart Econmech: So mau tutup balik ya?
Lo. W. H (HKL-Site Engineer): Which floor plan ?
Lo. W. H (HKL-Site Engineer): See see
Dart Econmech: L6
 Lo. W. H (HKL-Site Engineer): You show me
 Lo. W. H (HKL-Site Engineer): 😡‍πŸ’«

Lo. W. H (HKL-Site Engineer): Tu you punya drawing
 Dart Econmech: Okok tq πŸ™πŸΏ
EG MALL Azman: M&E inspection in progress. @~Walker Yapi please stanby.
 Lo. W. H (HKL-Site Engineer): Mana you dapat tu drawing
Dart Econmech: Owh dwg lama sdh ni. Got escalator until L7 suda
Dart Econmech: Means smokespill must go L7 😭
Dart Econmech: Until*
 +60 14-379 2990: Okay otw.
Lo. W. H (HKL-Site Engineer): Na … saya ingat si Lan yang kasih
 EG MALL Azman: @~Walker Yapi πŸ‘†plinth..
Raymond Chong. Y. F (HKL P. Manager): Done casting for plinth
 +60 14-379 2990: Thank you Boss @Raymond Chong. Y. F (HKL P. Manager)
 EG MALL Azman: 3rd floor, TB3. M&E inspection done. @Mr. Voo @~nas4rie please proceed. πŸ‘Œ
 Mr. Voo: πŸ‘πŸ»

































 

No comments:

Post a Comment