SITE GROUP

 EG MALL Azman: 1st floor TB/4. Request for inspection today at 3pm. @Kadapi J. PROMES . NSC please get ready on site during inspection.

 +60 12-843 3877: Installation pvc conduit@level -1-





NSC GROUP

 EG MALL Azman: Site progress photo. 
28/10/23.
1st floor. TB/3. Slab rebar and M&E in progress.
 EG MALL Azman: 1st floor. Z7. Beam rebar in progress.
EG MALL Azman: 5th floor. TA2. Slab formwork in progress.
EG MALL Azman: 1st floor. TB4a. Slab/column formwork and support scaffolding in progress.
EG MALL Azman: 6th floor. Lift wall rebar in progress.
 EG MALL Azman: 2nd floor. TB5. Column rebar in progress.
 EG MALL Azman: @~LO KEAM please study and return back to us ASAP this queries to enable us design the slab if possible. Thanks. Genset room, transformer room and switchgear room.🙏🙏🙏
 +60 19-895 9900: In progress bos, need time to study
Raymond Chong. Y. F (HKL P. Manager): @~Ka Pang Liaw @Edwin Chen 013 @~Lawrence Yapp @Dart Econmech kindly write a "Notice of Delay" letter to us pertaining to final confirmation of changes to your scope of work i.e shopdrawing, systems, equipments, site works and so on to create an delay event by next Tuesday. TQ
 +60 19-895 9900: a) will provide shortly
b) &c) yes, will shown in updated shop dwg later
d) we do not prefer kerb but to hav rise floor, this is for the ease of equipments mobilization & to prevent flooding issue during construction & future maintenance.
Hope the above clarified tq
 EG MALL Azman: Noted. Thanks..
EG MALL Azman: @~Rimon Joseph @~Walker Yapi mari sini basement. Tgk ini fire tank room. Saya skrg ada di bawah.
 EG MALL Azman: @~Walker Yapi ini layout tiada ubah kan. Saya atur GnB untuk bikin ini plinth..👆
+60 14-379 2990: Proceed @EG MALL Azman

+60 12-843 3877: Installation pvc conduit@level -1-
 EG MALL Azman: @Mr. Voo @~Nasri tolong kejar ini slab rebar. 1st floor. TB4. Tinggal ini saja maw pasang konduit. M&E inspection jam 3pm ni.🙏🙏🙏
+60 14-379 2990: Selamat petang, request untuk housekeeeping kawasan plinth pump room.. kami tidak dapat mark point..@EG MALL Azman @~Nasri ..
+60 19-809 6068: @EG MALL Azman @~Nasri Itu lumpur tebal sama itu besi.  Kami tidak dapat marking layout sana.  Kalau boleh minta kasi clear itu besi dengan tu lumpur itu kawasan saja baru dapat marking.
 EG MALL Azman: @~Nasri tolong org susah🙏🙏
 EG MALL Azman: 1st floot. TB4. M&E inspection in progress.
EG MALL Azman: Inspection done yeh. @~Nasri @Mr. Voo please proceed.👌
Mr. Voo: 👍🏻

























 