Wednesday, October 25, 2023

26 OCT 23 HKL

SITE GROUP
EG MALL Azman: 2nd floor. TB5. Request for inspection M&E services at 3.45pm. @Kadapi J. PROMES
 Kadapi J. PROMES: Jom
Kadapi J. PROMES: Azman mana kau?
EG MALL Azman: Saya sini sda 2nd floor.
Kadapi J. PROMES: 👌👍
Kadapi J. PROMES: GL A/7. 1 point floor gully not yet install. KH please complete the thing b 4 casting. Tq
 HIDAYA KH office Num: okay noted



NSC GROUP
 HIDAYA KH office Num: Salam/Morning. minta tolong ya
 EG MALL Azman: @~Roxas Ng (Kai) tolong inform tu Joseph.. 🙏 dari kelmarin dia OTW.
 +60 16-832 2597: sudah saya minta dorg tolong, tapi masih lagi tak ada org.. saya check ada perkerja lain kita tak, kejap
 EG MALL Azman: @EG MALL Azman bila bolih tutup bata sini?
 EG MALL Azman: @Dart Econmech @HIDAYA KH office Num tolong atur macam mana? Nanti saya explain salah lagi. .
Dart Econmech: Ni pressurize. Nextweek sy pasang duct suda
 EG MALL Azman: Tolong atur ya. Maw atur itu bata cepat2.
 Dart Econmech: Ok next week start installation
 +60 16-832 2597: @EG MALL Azman @HIDAYA KH office Num
 +60 16-832 2597: Dah pindah ya
 HIDAYA KH office Num: okay thanks
 EG MALL Azman: Site progress photo. 
26/10/2023.
1st floor. Z7. Slab formwork in progress.
 EG MALL Azman: 2nd floor. TB5. Slab rebar and M&E services in progress.
EG MALL Azman: 1st floor. TB4. Slab formwork and beam rebar in progress.
 EG MALL Azman: 5th floor. TA2. Slab formwork in progress
EG MALL Azman: 6th floor. Lift wall rebar and formwork in progress
 EG MALL Azman: Basement, z9. Slab foundation in progress
EG MALL Azman: @~Walker Yapi consultant comment. Make it straight.. 👆
 +60 14-379 2990: Noted..
Lo. W. H (HKL-Site Engineer): Ada pipe rwdp kah d TB/5 2nd floor @HIDAYA KH office Num
 HIDAYA KH office Num: ada
Lo. W. H (HKL-Site Engineer): tolong simpan ya
HIDAYA KH office Num: okay

EG MALL Azman: For info, NSC please come early for a site meeting. We expect the meeting to start early at 2.30pm today.
 Lo. W. H (HKL-Site Engineer): @KH Karen @Edwin Chen 013@HIDAYA KH office Num @Leung KH🍀
Lo. W. H (HKL-Site Engineer): Dear valued NSC, this is the latest drawing from architect that received now..
 EG MALL Azman: 2nd floor. TB5. M&E services inspection in progress.
EG MALL Azman: Plumbing pipe sleeve inspection..
Dear all, base on these latest Construction Drawing issued by Architects for 6th & 7th Floor M&E rooms, kindly furnish us the equipment weight and catalogues for consultant engineer's floor load design ASAP. Thanks
 EG MALL Azman: Done inspection. @Mr. Voo @~Nasri please proceed.
 Lo. W. H (HKL-Site Engineer): Level 6 queries 
1) The weight of each equipment 
2) Any plinth beam/slab required , if yes, the size of the plinth
3) Any level 6 slab opening ?
4) Is it possible the level M&E Room do with kerb , rather than 100mm higher than existing slab level ?
 Lo. W. H (HKL-Site Engineer): Same
Lo. W. H (HKL-Site Engineer): Dear valued NSC please reply this on the flat slab that yet cast
 +60 12-843 3877: Installation pvc conduit and trunking @Level _1

Jimmy HKL: Senarai nama pekerja tolong beri hari ini atau selewatnya hari isnin 30.10.2023. Ini untuk kita adakan kursus kad hijau. tq





























 