SITE GROUP
EG MALL Azman: 13/09/23.
3rd floor. TB2. Slab cast.
EG MALL Azman: 4th floor. TA1. Column rebar in progress.
EG MALL Azman: 4th floor. Z6. Slab cast.
EG MALL Azman: 6th floor. Z4. Slab formwork and scaffolding.
EG MALL Azman: 6th floor. Z5. Lift wall rebar and column in progress.
EG MALL Azman: 6th floor. TB1. Column rebar.
EG MALL Azman: Ground floor. TB3/TB4. Slab rebar and M&E in progress.
EG MALL Azman: 1st floor. TA2. Beam rebar in progress.
EG MALL Azman: Basement. Z4a. Retaining wall cast.
EG MALL Azman: Ground floor. Zone TB3/TB4. Request for inspection M&E services today at 3pm. @Kadapi J. PROMES . @~Walker Yapi @HIDAYA KH office Num @~.Fazli .. 🙏🙏
NSC GROUP
EG MALL Azman: Ground floor. TB3. Escalator pit inspection with consultant and Mitsubishi.
EG MALL Azman: M&E services inspection in progress.
EG MALL Azman: Fire & Acmv inspection
EG MALL Azman: @EG MALL Azman tu pipe 4" tapi buka 1kaki siapa mau tutup o
EG MALL Azman: @HIDAYA KH office Num tolong check. Kamu punya barang ka itu? Tolong atur dia..
HIDAYA KH office Num: Okay2
EG MALL Azman: Tolong ya.. 🙏🙏🙏
HIDAYA KH office Num: Ya. Kami tutup skrg
Lo. W. H (HKL-Site Engineer): Sudah tu rwdp dropper simpan kah @HIDAYA KH office Num
HIDAYA KH office Num: Sudah
Lo. W. H (HKL-Site Engineer): Ambil gambar
Lo. W. H (HKL-Site Engineer): Dalam staircase lobby ya
HIDAYA KH office Num: Iya
Lo. W. H (HKL-Site Engineer): Saya ingat Ada 2 rupa 1 saja
EG MALL Azman: M&E inspection done with some minor comment and rectification work. @Mr. Voo @~Nasri please proceed. 👌
Lo. W. H (HKL-Site Engineer): Ada punching through pergi beam retaining wall kan
Lo. W. H (HKL-Site Engineer): Ok 👌
HIDAYA KH office Num: Done
EG MALL Azman: Itu lubang kecil try kasi sumbat dia.
HIDAYA KH office Num: Okay
EG MALL Azman: Tolong inform GnB punya supervisor Apat. Bagi mereka cek dulu. TQ..🙏
HIDAYA KH office Num: Okay boleh