SITE GROUP
Kadapi J. PROMES: Minta hkl buka request for inspection untuk material on site untuk DO ni. Inform drg masa hadapan semua material untuk claim perlu inspection
Kadapi J. PROMES: Instruction from my boss Syamsulflan. Tq
EG MALL Azman: Noted. Reminder again. Material on site, mesti submit RFI form, D.O, picture. 🙏
.
EG MALL Azman: @Kadapi J. PROMES request for inspection. 6th floor. Zone 4 at 10.30am
NSC GROUP
Raymond Chong. Y. F (HKL P. Manager): @EG MALL Azman ground floor Econmech storage area
EG MALL Azman: Good morning.
Site progress photo.
24/08/2023.
6th floor. Zone 4. Slab rebar & M&E in progress.
EG MALL Azman: 6th floor. Zone 5a. Lift wall, column rebar in progress
EG MALL Azman: 6th floor. Zone 5b. Slab cast..
EG MALL Azman: 3rd floor. TA1. Lift wall formwork, 4th floor, slab & support scaffolding in progress.
EG MALL Azman: 6th floor. TB1. Slab formwork in progress.
EG MALL Azman: 4th floor. Slab formwork in progress.
EG MALL Azman: Noted bos. 👌
+60 16-832 2597: @~Walker Yapi @Dart Econmech new location for ur storage; as ur precious area has clash with new setting of wall
EG MALL Azman: Ground floor. TA3. Slab formwork and rebar in progress.
Dart Econmech: Thanks 🙏🏿
+60 14-379 2990: thank you kai.
Lo. W. H (HKL-Site Engineer): Dear valued NSC, the ☝️is the cad file of latest archi drawing
EG MALL Azman: Ground floor. TA3. Please be inform casting plan for this area by 24/08/2023. Tomorrow. NSC please double check your services. @~. @~Walker Yapi @Leung KH🍀
+60 14-379 2990: 👍🏻
EG MALL Azman: 6th floor. Zone 4. M&E inspection done. @~Nasri please proceed.. 👌
No comments:
Post a Comment