Monday, August 21, 2023

22 AUG 23 HKL

SITE GROUP

Kadapi J. PROMES: Level 6. R.c. joint. Conduit damaged
Kadapi J. PROMES: DCC's conduits

Kadapi J. PROMES: EM. Please do a proper conduit installation. In this way it may effected the structure quality.
 Kadapi J. PROMES: With a long "S" joint




+60 17-866 0355: ok bos nanti kami repair


 +60 17-866 0355: ok bos sudah repair
 Kadapi J. PROMES: 👍👌

NSC GROUP
Lo. W. H (HKL-Site Engineer): dear valued nsc, this is the latest layout basement -2nd floor received today, please go thoroughly.....should it involve your scope....please revised your shop drawing accordingly


 +60 12-843 3877: ELE&EV inspection L6




+60 12-843 3877: Inspection done



 

No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...