Monday, August 21, 2023

22 AUG 23 HKL

SITE GROUP

Kadapi J. PROMES: Level 6. R.c. joint. Conduit damaged
Kadapi J. PROMES: DCC's conduits

Kadapi J. PROMES: EM. Please do a proper conduit installation. In this way it may effected the structure quality.
 Kadapi J. PROMES: With a long "S" joint




+60 17-866 0355: ok bos nanti kami repair


 +60 17-866 0355: ok bos sudah repair
 Kadapi J. PROMES: 👍👌

NSC GROUP
Lo. W. H (HKL-Site Engineer): dear valued nsc, this is the latest layout basement -2nd floor received today, please go thoroughly.....should it involve your scope....please revised your shop drawing accordingly


 +60 12-843 3877: ELE&EV inspection L6




+60 12-843 3877: Inspection done



 

No comments:

Post a Comment

EGMALL COORDINATION (26/6/2025)

   EGMALL COORDINATION (26/6/2025) [26/6/2025 4:41 PM] Azman HKL: Consultant commented. DCC ada orang maw rectify ini ASAP. 👏 [26/6/2025 4:...