Azman HKL: Site progress picture.
12/8/23.
6th floor. 5a. Slab rebar n M&E in progress.
Azman HKL: 6th floor. 5b. Slab formwork in progress.
Azman HKL: 1st floor. TB2. Slab rebar and M&E
Azman HKL: 5th floor. TB2. Floor slab formwork in progress.
Azman HKL: 3rd floor. Zone 6. Slab rebar in progress.
Azman HKL: Ground floor. TB3 in progress
Azman HKL: 3rd floor. TA1. Slab formwork in progress..
Azman HKL: 1st floor, TB2. @~Leppong @~Walker Yapi @Leung KH🍀 PIC please check your services in this area. New casting plan is by today. If there is any obstruction please inform us.
+60 17-866 0355: Ok man
Azman HKL: 6th floor. 5a. Slab M&E sercices inspection done. @Lo. W. H (HKL-Site Engineer) @~Nasri please proceed.
Azman HKL: 1st floor. TB2. M&E pre-inspection in progress..
Azman HKL: Pre-inspection M&E.
Azman HKL: 1st floor. TB2. M&E services inspection done. @Lo. W. H (HKL-Site Engineer) please proceed.
Lo. W. H (HKL-Site Engineer): Ok bro