Wednesday, August 2, 2023

02 AUG 23 HKL

 

SITE GROUP

Azman HKL: Ground floor. Zone TA2 slab. Request for inspection M&E services at 4.00pm.  @Kadapi J. PROMES πŸ™πŸ™

NSC GROUP

 Azman HKL: Good morning.
Site progress picture.
2/8/2023.
Ground floor. TA2. Beam/slab rebar in progress.
 Azman HKL: 5th floor. Zone 4. Slab formwork in progress.
 Azman HKL: 5th floor. Zone 5a. Column & lift wall rebar in progress. 6th floor, slab formwork and scaffolding in progress.
 Azman HKL: 2nd floor. TA1. Lift wall formwork in progress.
Azman HKL: 3rd floor. Zone 6. Slab scaffolding and formwork in progress
.
Azman HKL: Basement. 7a. Staircase formwork and column work in progress.
 Azman HKL: Basement. 5b. Earthwork & Slab foundation in progress
.
 Azman HKL: Basement. 8c/8d. Earthwork & slab foundation in progress.
Azman HKL: Ground floor. TA2. Slab rebar n M&E in progress.
Azman HKL: @Leung KHπŸ€ @~Walker Yapi take note ya. Kamu punya servis ini area. Cast plan ini hari. πŸ™πŸ™πŸ™
+60 14-379 2990: Okok..
 Lo. W. H (HKL-Site Engineer): Ada rwdp kah
 Lo. W. H (HKL-Site Engineer): @Leung KHπŸ€ check a
 +60 10-941 8970: GL column L/11 conduit done install
 +60 17-866 0355: GL 11/ L done




















No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...