18 JULY 23 HKL


NSC GROUP
+60 17-866 0355: Azman boleh tolong pindah ni besi tidak dapat pasangan conduit
 Azman HKL: Ok bro..
 +60 17-866 0355: 4th floor
 +60 17-866 0355: TQ broo
 Azman HKL: Site progress picture. 
18/07/2023.
2nd floor. Zone 6. Slab cast.
Azman HKL: Basement, zone 8b. Slab cast.
 Azman HKL: Basement. Zone 8a. Retaining wall cast.
 Azman HKL: View mata helang..
 Azman HKL: 5th floor. 5a. Slab formwork in progress.
Azman HKL: 4th floor. Zone 4. Slab rebar and M&E in progress.



 Lo. W. H (HKL-Site Engineer): Dear all valued NSC, the above is the latest revised archi drawing that we have as of today
Lo. W. H (HKL-Site Engineer): kindly take note, if the layout affected your M & E services
 Dart Econmech: Do u hv cad file?
+60 19-895 9900: Can email to our ofis?
Edwin Chen 013: Better by email. Make it official
Lo. W. H (HKL-Site Engineer): I have requested but not being entertained yet....once receive will share or email you all
 Dart Econmech: Sure affected la
 +60 19-895 9900: PDF also pls email to ofis pls๐Ÿ™๐Ÿป๐Ÿ™๐Ÿป๐Ÿ™๐Ÿป
 Lo. W. H (HKL-Site Engineer): Noted
 +60 19-895 9900: Tqvm
Lo. W. H (HKL-Site Engineer): Please be reminded that all this drawing is subjected to another round of amendments, if any











 