Thursday, July 6, 2023

07 JULY 23 HKL

NSC GROUP


 Dart Econmech: Morning.

Monday nextweek sprinkler pipe will arrive at site. Time to be advise.

I still proposed the pipe unloading temporary at nearby guard house (container park).

I need 2 3 days for the transferring pipe into the building.

🙏🏿@Azman HKL
 Azman HKL: Ok noted.
 Raymond Chong. Y. F (HKL P. Manager): Genset Plinth siap sd


 

No comments:

Post a Comment

  EGMALL COORDINATION (6 18th floor. Tower B. Installation. ELV, Electrical, ACMV, FF drain pipe services done installation. 18th floor. Tow...