Azman HKL: Morning. @Kadapi J. PROMES request for pre-inspection. 10.30am. 4th floor, zone 5a. πŸ™
Dart Econmech: @Lo. W. H (HKL-Site Engineer) can run forklift ya inside this area
Dart Econmech: Grd floor
 Lo. W. H (HKL-Site Engineer): can ba if amal
Lo. W. H (HKL-Site Engineer): Small
Dart Econmech: 3ton
Dart Econmech: But prop can open temporary ka
Dart Econmech: i-9 to i-10
Azman HKL: Request M&E inspection 4th floor. Zone 5a. 3.00pm.
 Kadapi J. PROMES: Coming
 Azman HKL: @~Walker Yapi tomong atur ini. Consultant comment jauh dari dinding lebih 4".
Azman HKL: Jauh dari tiang..
Azman HKL: Rain rain go away.. πŸ˜”πŸŒ§️
Kadapi J. PROMES: Hujan lebat ni bossku
Azman HKL: 🀲🏻
 Azman HKL: Econmech repair pipe. Kurang2 sudah hujan...


Azman HKL: M&E inspection in progress..


NSC GROUP

 Azman HKL: Good morning. 
Site progress picture.
3/07/2023.
4th floor. Zone 5a. 
Slab rebar & M&E in progress.
Azman HKL: 4th floor. Zone 4. Slab formwork in progress.
Azman HKL: 4th floor. Zone TB1. Slab formwork in progress.
Azman HKL: 1st floor. Zone 6. Slab scaffolding support in progress.
Azman HKL: 1st floor. TA1. Lift wall formwork in progress. Slab scaffolding support in progress.
Azman HKL: Basement, zone 3b, retaining wall 1st cast.
 Azman HKL: @Leung KHπŸ€ morning . Tolong cek ini tempat ST8, 4th. CW/SW pipe sleeve atau opening.. πŸ™.
Azman HKL: @~Walker Yapi tomong atur ini. Consultant comment jauh dari dinding lebih 4".
[09:08, 03/07/2023] +60 14-379 2990: Okok.. Kejap
Dart Econmech: Alaa. sapa punya

Edwin Chen 013: Basement
Edwin Chen 013: @Azman HKL , Any arrangement for the casting of the grease ejector plinth?
Raymond Chong. Y. F (HKL P. Manager): @Azman HKL please make arrangements to cast this plinth and get surveyor to provide plinth finish level before casting
 Raymond Chong. Y. F (HKL P. Manager): @Edwin Chen 013 estimate when will the ejector delivery?
 Azman HKL: Latest, Johanes informed me by this week before Wednesday bos.
 Raymond Chong. Y. F (HKL P. Manager): before Wednesday means tomorrow, please follow up with him
Azman HKL: Yes sir. I chase him.
Azman HKL: Hujan rintik2.. 🌧️
Azman HKL: @Leung KHπŸ€ please confirm me if any plumbing services here. πŸ‘†
 Leung KHπŸ€: No any plumbing service here tqπŸ™πŸ»
Azman HKL: M&E services inspection in progress..
Azman HKL: Repair work in progress..
Azman HKL: Done m&e inspection. Can proceed. @Mr. Voo @+60 16-832 2597




























 