Tuesday, June 13, 2023

13 JUNE 23 HKL

SITE GROUP

 Kadapi J. PROMES: Azman bossku, check klu ada switches, sso atau fire alarm bell conduit turun. Install awal lebih baik dr pahat upper beam d ground floor.
 Kadapi J. PROMES: Kemek sdh si kawan ni😅
 Azman HKL: Noted. Iya bos. @~.
+60 17-866 0355: sudah kasih bagus bos

NSC GROUP
Azman HKL: Site progress picture.
13/06/2023.
3rd floor. Zone 5b. Bottom rebar & M&3 in progress.
Azman HKL: 3rd floor. Zone 3a. Mall lift wall rebar in progress.
Azman HKL: 3rd floor. Zone 4. Slab rebar in progress. 1st floor. Zone TA1. Slab formwork in progress.
 Azman HKL: 1st floor, lift wall rebar in progress.
Azman HKL: Ground floor, column rebar in progress.
Azman HKL: Basement, TB3, column cast. TB4, slab foundation in progress.
 Azman HKL: Ground floor, zone 7. Beam formwork in progress.
 Azman HKL: Partial inspection, alarm, Hosereel and smoke detector services.
 +60 14-331 3232: @Azman HKL grd flr..mailbox gridline J - 4 Sini
 +60 14-331 3232: Mau concrete balik
 +60 14-331 3232: Bata tidak dpat jalan
 +60 14-331 3232: Siapa punya lubang
Azman HKL: @Leung KH🍀 tolong cek sini.
Azman HKL: 3rd floor, 5a. M&E done inspection can proceed. @+60 10-941 8970
+60 14-331 3232: Tutup habis tu lubang
 +60 14-331 3232: Ground floor punya
+60 14-331 3232: 👆🏻👆🏻
Edwin Chen 013: @Lo. W. H (HKL-Site Engineer) , Please check and confirm as per our discussion just now at the site.
Lo. W. H (HKL-Site Engineer): Waiting tie ABLT

























 