Sunday, April 9, 2023

10 APR 23 HKL

NSC GROUP

 +60 17-866 0355: @Azman HKL Conduit patah kena langgar masa pasang besi tiang.
Azman HKL: Alamak. Knpa tu? Ada cara maw sambung ka tu.
 +60 17-866 0355: Mana dapat, kena paksa pahat lagi tu lantai kasi keluar konduit. Baru dapat sambung.
Azman HKL: Ok. Tidak sengaja bah tu. Cuba kamu tgk dulu kalau kamu dapat atur korek 🙏. Kalau tidak dapat saya minta tolong subcon hack bagi kamu.
+60 16-526 1788: Azman,, you should issue a memo to RC subcont to inform Incase any conduit pipe broke or damage, before this issue getting worst in future.
 +60 16-526 1788: Thanks
 +60 16-526 1788: Especially involve water or RWDP
 +60 16-526 1788: Also Aircond
+60 16-526 1788: Reduce unnecessary defects
+60 16-526 1788: NSC personnel should have to eye on your works before closing formwork, please work together. Thanks
 +60 16-526 1788: Put this in your meeting minutes,, responsible should bare by all.
 Azman HKL: Yes. Ok bos.. I also monitor and inform site personnel. I hope all workers can work together.
 Azman HKL: @~YoonYK @~Liaw Ka Pang morning. Can schedule tomorrow to check lift wall together with consultant. 1pm.
 +60 19-821 8251: Morning, can make it earlier like 10am? Afternoon 2pm got meeting. Sorry about that.
 Azman HKL: Ok can.. 10am la.
 +60 19-821 8251: Ok thanks.
Lo. W. H (HKL-Site Engineer): @~YoonYK boss escalator at gridline 6-7/D-E
Lo. W. H (HKL-Site Engineer): Ubah tempat
 Lo. W. H (HKL-Site Engineer): Your setting out still the same ?
+60 19-821 8251: Like our email to reply on this matter on the 4th of april, the escalator details remains unchanged as the floor height remain the same. Please ensure the beam to beam measurment and escalator at 1st floor follow our shop drawing. Thanks.
 Lo. W. H (HKL-Site Engineer): Noted thanks 🙏

 Azman HKL: Site picture progress.
10/04/23. Ground floor. GL: E-D/6-11.
 Azman HKL: Basement. Zone 2&3. Slab rebar in progress.
 Azman HKL: Basement. Zone 2-3. Rebar in progress
 Azman HKL: Zone 4. 1st floor slab. Column in progress.
Azman HKL: 6th floor.
 Azman HKL: Basement zone 5a. Basement Foundation rebar in progress
Azman HKL: Ramp3. Formwork and beam rebar in progress.


 +60 17-866 0355: GL / 12

 

No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...