Azman HKL: Good morning.
Site progress. 27/02/2023.
6th floor slab. Column rebar in progress.
Azman HKL: 6th floor. Column rebar in progress
Azman HKL: Basement. Zone 2&3. Earthwork in progress.
Azman HKL: Ground floor. Zone 1&2. Column rebar in progress. Cable & conduit in please take note.
Azman HKL: 1st floor. Zone 1D. Slab formwork in progress.
Azman HKL: Ground floor. Zone 1D. Slab formwork in progress. Please check the trenches dimension as per requirement.
Azman HKL: Earthing cable inside column. Ground floor zone 1.
NSC GROUP
Azman HKL: 6th floor. Column 5/I conduit done installed. Ready for inspection with consultant.
@Leppong , @. , PDF drawing detail for Ramp 5 from ABLT. 👆
Azman HKL: Silap uni predestrian ramp.
Azman HKL: Earthing cable inside column. Ground floor zone 1.
Azman HKL: Column GL: 1a/K.
Azman HKL: Column GL: 1a/L