Tuesday, February 14, 2023

15 FEB 23 HKL

 

NSC GROUP
Lo. W. H (HKL-Site Engineer): Installing basement wall formwork zone 1Db
 Lo. W. H (HKL-Site Engineer): jeng jeng jeng


No comments:

Post a Comment

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...