Thursday, November 24, 2022

25 NOV 22 HKL

SITE GROUP
Azman HKL: Site progress. 25/11/2022 3rd floor conduit installation
Azman HKL: 3rd floor formwork

Azman HKL: Basement watertank

Azman HKL:  Basement pile cap
Kadapi: As i mention to KH b 4 regarding DP10. Please double check either it continuesly to the floor above or ended at level 2? Also the room size is it fit with our MnE or how? GL 5/I. Tq








NSC GROUP

Azman HKL: @Joseph Wong KH RFI for this pump sump opening..
Edwin: Architecture works also need M&E contractor to submit RFI?
Azman HKL: That pump sump opening to fit pump set M&E. For me better to submit RFI to check  if any discrepancy of the drawing.




 