12 NOV 22 HKL
SITE GROUP
12/11/2022. GL: F-I/7-8, Conduit installation in progress..
Installation of Sanitary pipe sleeve. 2nd Floor. GL: F-I/7-9
Basement water tank
K/9 area flooding after heavy rain. (yesterday)
L/6 area
2.32pm
4.13pm - sambung..