Friday, November 11, 2022

12 NOV 22 HKL

SITE GROUP

12/11/2022. GL: F-I/7-8, Conduit installation in progress..

Installation of Sanitary pipe sleeve. 2nd Floor. GL: F-I/7-9

Basement water tank

K/9 area flooding after heavy rain. (yesterday)

L/6 area

2.32pm

4.13pm - sambung..







 