Sunday, November 6, 2022

07 NOV 22 HKL

SITE GROUP

Mitsubishi Mr Lo joint inspection escalator opening with consultant.



NSC group

Joseph KH : MR.Azman afternoon, at site can show location for Manhole 1 & 2, Because  I need to put C.I.puddle flange on retaining wall. Thanks
Azman: Later I come back to you. I check drawing first.

05.11.2022 Lo :
Dear all, this is the pump sump x 7 nos and interceptor sump x 2 nos layout plan
i need you all study on the feasible construction, should there any obstruction please highlight asap, expecially area g/l: L/1a-4a
all structure to capture this pump sump x 7nos and interceptor sump x 2nos
all shall be 1200mm depth
07.11.2022 Lo : anyone got objection on the layout ?
Joseph KH : KH no objection on the layout.
Lo: the plinth at water tank area (cold water suction - mall) is compromised to shift
will this not affect the sump? please advice