SITE GROUP
Site progress. 31/10/2022
2nd floor
Lift pit
Basement watertank
Kadapi : Should have details of this through r.c. wall.
Kadapi : Please prepare details of punch trough r.c. wall.
AZMAN : @Joseph Wong KH please double check. Your soil and waste pipe dropper pipe from hotel outlet to Main hole. If any pipe sleeve thru basement wall.

.jpeg)
.jpeg)


.jpeg)

.jpeg)

No comments:
Post a Comment