detail A as per Mitsubishi shop drawing ...kindly coordinate / work out detail on structural beam layout

Basement water tank plinth inspection with PSB and KH.

Water tank plinth at basement. Steel bar plinth in progress..



Ground floor. GL: G/7 column. ELV

Ground floor, GL: G/8, ELV, column

GL: F/7,  conduit ELV, column.

Basement watertank plinth inspection.



No comments:

Post a Comment

EGMALL COORDINATION (26/6/2025)

   EGMALL COORDINATION (26/6/2025) [26/6/2025 4:41 PM] Azman HKL: Consultant commented. DCC ada orang maw rectify ini ASAP. 👏 [26/6/2025 4:...