Friday, September 30, 2022

30 SEPT 22


 

30 SEPT 22 HKL

Install conduit for small power Mall GF

Site progress. 30/09/2022. Slab ground floor. GL: F-H/8-11. 1st layer in progress. NSCs please take note. Target concrete on monday. Steel installation will continue on saturday and sunday.

GL: I-L/5-6.

GL: J-L/1-5






 

Thursday, September 29, 2022

29 SEPT 22













 

29 SEPT 22 HKL

Site progress. 29/09/2022. 8.20am. Ground floor GL: 8-11/F-H

4.40pm. GL: F-H/8-11. Tonite   1st layer bar.


Night work today fixing ground beam rebar




 

Wednesday, September 28, 2022

28 SEPT 22




 

28 SEPT 22 HKL

Mall-Ground Floor slab concrete.  GL; F-H/5-8.

Leancon, GL: K-L/5-8, cold water tank & pump room Mall.

Column concrete. GL: H-I/5-6
Est. 28/09/2022 today.
Slab concrete. GL: F-H/8-11
Est. 3/10/2022 Monday.

GL: G-L/1a-4.

H/10 column. Small power..

GL: H-I/5-6 column.




 

Tuesday, September 27, 2022

27 SEPT 22 HKL

 

Kadapi : Please check archi detail for the open kiosk. I think its not good idea that cold water supply coming from high level hanging its self.
Please tie up properly to the rebar. It risky during casting. It may move or loss by vibration machine. Tq



Kadapi : Casting started, atleast 1 worker from NSCs stay with just incase of MnE damaged then can rectify on the sport. Tq









M&E Coordination meeting no.01. 27/09/2022, 3.07pm.




M&E item inspection with consultant. GL: F-H/5-8.

EGMALL NSC (23 SEPT 2024)

  EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...