Friday, March 28, 2025

EGMALL COORDINATION(28/3/2025)

  EGMALL COORDINATION(28/3/2025)

28/07/2025
7M. Request for inspection at 2.30pm. @~sam . Site NSC PIC, please standby on site during inspection .

7M. M&E inspection.

[28/3/2025 3:01 PM] Azman HKL: Done inspection. @EG MALL Nasri please proceed..
[28/3/2025 3:42 PM] EG MALL Nasri: Ok man thank you 🫡


EGMALL COORDINATION(27/3/2025)

 EGMALL COORDINATION(27/3/2025)






[27/3/2025 9:43 AM] HIDAYA KH office Num: morning. Our pipes sustained damage during the hacking process, as shown in the attached image. Please be advised that these pipes have already undergone our standard pressure testing to ensure their integrity. However, we are currently unsure if other rooms may be experiencing the same issue. Further assessment may be required.
[27/3/2025 9:47 AM] Kadapi J. PROMES: Please rectify and re-call for official pressure test. Please list down how many room diffected. Tq
[27/3/2025 9:58 AM] HIDAYA KH office Num: @Azman HKL
[27/3/2025 9:59 AM] +60 12-559 6863: Hidayah, location?
[27/3/2025 10:03 AM] Azman HKL: Thanks for inform. I will check with Debra or Michael the defect work. 👏
[27/3/2025 10:05 AM] Azman HKL: Hotel, what level and the current room.
[27/3/2025 10:19 AM] HIDAYA KH office Num: hotel 13th floor . room 18&20
[27/3/2025 10:24 AM] Azman HKL: Okay thanks. Itu tempat paip saya minta mereka jangan tutup dulu. Tolong rekod saja. Repair dan retest dulu.



EGMALL COORDINATION(21/3/2025),(25/3/2025)

 EGMALL COORDINATION(21/3/2025)


EGMALL COORDINATION(25/3/2025)

AZMAN: Site joint inspection. Client, consultant and SESB.

AZMAN: Tower B. 14th floor. M&E services section..

AZMAN: Tower B. 14th floor. M&E inspection done. @EG MALL Nasri please proceed. 👌



EG MALL SITE DAILY (28 MARCH 2025)

  EG MALL SITE DAILY (28 MARCH 2025)

























EG MALL SITE DAILY (27 MARCH 2025)

 EG MALL SITE DAILY (27 MARCH 2025)






















EG MALL SITE DAILY ( 31 JULY 2025)