SITE EG MALL
[09:23, 01/02/2024] Azman HKL: @~ShawnChia @~Leppong pasang tape dan jaga ini tempat.. urgent. ππ
[09:34, 01/02/2024] +60 12-559 6863: Mr. Johnny, this area open for M&E equipment hoisting down to basement now, will put back the barricade once completed hoisting
[09:39, 01/02/2024] +60 16-880 4632: Put precaution sign...
[09:39, 01/02/2024] +60 12-559 6863: DCC PIC is there controlling
[09:46, 01/02/2024] +60 16-880 4632: π
NSC GROUP
[08:40, 01/02/2024] +60 12-559 6863: King Hong, please clear this scaffold after your work is done
[08:42, 01/02/2024] HIDAYA KH office Num: yaa boss. will clear as soon as work done
[08:51, 01/02/2024] HIDAYA KH office Num: sorry boss. i already asked our worker, they didn't use that scaffolding. that was used by other worker that were hacking the column.
[08:58, 01/02/2024] Azman HKL: Nanti saya check dia siapa pakai. KH punya saya tahu pakai mobile scaffolding.
[08:58, 01/02/2024] Azman HKL: @~ShawnChia @~Leppong sda clear.
[08:58, 01/02/2024] HIDAYA KH office Num: iyaaa. lagi satu kami tidak pakai kayu
[09:00, 01/02/2024] +60 16-837 8881: Tq banyak banyakππ»ππ»
[09:02, 01/02/2024] Azman HKL: Ini sda clear. Tapi minta org kamu jaga ya. Takut ada org jatuh dalam..
[09:31, 01/02/2024] Azman HKL: Transformer lifting to the basement in progress.
[09:35, 01/02/2024] Azman HKL: Site progress photo.
1/2/24
14th floor. TA1. Slab cast. TA2. Slab formwork in progress
[09:35, 01/02/2024] Azman HKL: 1st floor. TB6. Slab formwork and support scaffolding work in progress.
[09:35, 01/02/2024] Azman HKL: 6th floor. Z7. Column rebar in progress. 5th floor. Ramp7 formwork in progress.
[10:10, 01/02/2024] +60 12-559 6863: @Azman HKL share gambar hoisting down equipment ke basement
[10:14, 01/02/2024] Azman HKL: Otw.. @~ShawnChia @~Leppong tolong ya gambar.
[10:15, 01/02/2024] +60 16-837 8881: Tambah support
[10:16, 01/02/2024] +60 12-559 6863: angkat 1 demi 1 bah, itu slab tidak bolih tahan oh
[10:17, 01/02/2024] +60 12-559 6863: 1 trip 1 machine
[10:18, 01/02/2024] +60 12-559 6863: @Azman HKL kasi tambah prop
[10:18, 01/02/2024] +60 12-559 6863: rapat sikit prop
[10:28, 01/02/2024] Azman HKL: Ya. Tambah sda 3. Maw tambah lagi 2 bos.
[10:32, 01/02/2024] +60 12-559 6863: slab Bawah jugak perlu tambah
[11:37, 01/02/2024] Azman HKL: 3 nos transformer in the basement
[11:55, 01/02/2024] Azman HKL: 3rd floor. Water tank. Slab water proofing in progress
[14:07, 01/02/2024] Azman HKL: 14th floor. TA2 Slab formwork and plumbing pipe in progress. TA1. Column rebar in progress.
[14:43, 01/02/2024] Azman HKL: Site progress meeting start.
.
Tuesday, January 30, 2024
Subscribe to:
Posts (Atom)
EGMALL NSC (23 SEPT 2024)
EGMALL NSC (23 SEPT 2024) [23/9/2024 9:24 AM] EG MALL Mr Lo: @HIDAYA KH office Num ft ya Sini thanks [23/9/2024 9:24 AM] EG MALL Mr Lo: ...
-
SITE EG MALL [11:28, 14/03/2024] +60 16-880 4632: Jackson.. protruding column can hack to flush wall.. [11:31, 14/03/2024] +60 16-880 4632: ...