Monday, May 29, 2023
29 MAY 23 HKL
SITE GROUP
Azman HKL: Good morning.
Site progress picture.
29/05/2023.
Ground floor. Zone 7. Beam and slab rebar in progress.
Azman HKL: 3rd floor. Zone 5. Slab formwork and beam rebar in progress.
Azman HKL: 3rd floor. Zone 4. Slab formwork in progress.
Azman HKL: 3rd floor. TB1. Slab formwork in progress.
Azman HKL: Ground floor. TB2. Slab & beam rebar in progress.
Azman HKL: Basement. TB3. Column rebar in progress.
Azman HKL: Ground floor. TA1 lift formwork in progress.
Azman HKL: @~DartWeirdo 🇲🇾 @~Walker Yapi as per our discussion please take note your Smokespill opening at ground floor, zone 7. Also refer to the latest architect drawing.
Azman HKL: Make sure to put the trimmer bar y16 as per comment from the consultant.
NSC GROUP
Lo. W. H (HKL-Site Engineer): @~YoonYK
Lo. W. H (HKL-Site Engineer): Boss
Lo. W. H (HKL-Site Engineer): The escalator pit there need recess like what shown in R1 (cannot see too small)
Lo. W. H (HKL-Site Engineer): 50mm kah
Lo. W. H (HKL-Site Engineer): @Azman HKL ngam kah
+60 19-821 8251: Do you mean this?
+60 19-821 8251: Our drawing too small?
Lo. W. H (HKL-Site Engineer): whole stretch of 1591 kah
Lo. W. H (HKL-Site Engineer): yes
Lo. W. H (HKL-Site Engineer): from my sfl is 50mm drop lo
+60 19-821 8251: Basically from finish floor level we need 110mm. 👌
Azman HKL: Pit width 1591, pit depth 1150 from FFL.
Lo. W. H (HKL-Site Engineer): Ok
+60 19-821 8251: Yes, last time the drawing i send your side lost? Haha~
Lo. W. H (HKL-Site Engineer): Lost in old phone liao
Lo. W. H (HKL-Site Engineer): Wakakaka
+60 19-821 8251: Okok, later i send you another copy.
Lo. W. H (HKL-Site Engineer): Ok bro
Lo. W. H (HKL-Site Engineer): Ok
+60 17-866 0355: Zone 7 graund floor
+60 12-843 3877: Installation pvc cpnduit 80%done
Sunday, May 28, 2023
Subscribe to:
Comments (Atom)
-
EG MALL NSC ( 11 MARCH 2025) [11/3/2025 10:26 AM] +60 16-837 8881: Belum habis naik bata tapi mahu paitong sudah ? 6th floor. Genset roo...
-
EGMALL COORDINATION (22/4/2025) 0198218251(1.42PM) : Petang Azman, tolong pasang pintu untuk motor room di office block dekat tingkat 21....

.jpeg)

.jpeg)















.jpeg)
.jpeg)

.jpeg)
.jpeg)

.jpeg)

.jpeg)
.jpeg)

.jpeg)



.jpeg)

.jpeg)
.jpeg)

.jpeg)

.jpeg)
.jpeg)

.jpeg)



.jpeg)
.jpeg)

.jpeg)
.jpeg)

.jpeg)







.jpeg)

.jpeg)

.jpeg)
.jpeg)

.jpeg)

.jpeg)
.jpeg)























.jpeg)

.jpeg)

.jpeg)
.jpeg)

.jpeg)

.jpeg)

.jpeg)

.jpeg)


.jpeg)
.jpeg)

.jpeg)

.jpeg)